News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Latest PV Module Reliability Scorecard shows unsettling uptick in failures

admin by admin
27/05/2026
in Solar Contractors
0
Latest PV Module Reliability Scorecard shows unsettling uptick in failures
0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

Share

Independent testing lab Kiwa PVEL just published the 12th edition of its annual PV Module Reliability Scorecard. The digital resource is designed for solar industry stakeholders to access testing insights gained from the company’s flagship Product Qualification Program (PQP). The PQP, a comprehensive suite of extended reliability and performance tests, helps evaluate solar modules under a wide range of environmental and mechanical conditions.

Credit: Kiwa PVEL

New for 2026, ultraviolet induced degradation (UVID) has been included as a Top Performer category, along with the previous test categories: thermal cycling (TC); damp heat (DH); mechanical stress sequence (MSS); hail stress sequence (HSS); potential induced degradation (PID); light [and elevated temperature] induced degradation (LID+LETID); and PAN performance (PAN).

In the 12th edition, Kiwa PVEL names a total of 43 manufacturers as “Top Performers” in one or more of the tests, although for the first time, no single model achieved Top Performer status across all tests.

“Our 2026 Scorecard reflects a market that is advancing in performance while facing growing reliability pressures,” said Tristan Erion-Lorico, VP of sales and marketing of Kiwa PVEL. “We’re seeing reductions in power loss for some tests and increased energy yields in our PAN testing. At the same time, failure rates, particularly delamination and mechanical breakage, have reached new highs. These results underscore that innovation and cost cutting measures must be matched with consistent quality and robust design to ensure long-term field reliability in an increasingly cost-conscious industry.”

Key highlights from the 2026 Scorecard:

  • Some degradation decreased, but failures increased: Power loss reduced across some key tests (UVID, PID, TC and DH), yet overall failure rates hit record highs with 87% of manufacturers and 61% of BOMs experiencing at least one failure.
  • New Top Performers: The annual list of Top Performer manufacturers is increasingly dynamic, with 13 first-time Top Performers and some previous Top Performers notably missing from this year’s list.
  • No single leader across all metrics: While many manufacturers achieved Top Performer status, no single model met the Top Performer threshold in every test.
  • Failure types shifting and intensifying: Module breakage (especially in MSS and HSS) remains the top issue, but delamination surged significantly with 45% of manufacturers having at least one major delamination defect.
  • Design and material trade-offs matter: Cost and efficiency optimizations (e.g., thinner encapsulants, zero-busbar designs, thinner frames) are linked to higher degradation or failure risk, highlighting the importance of balancing quality and design.
  • Performance gains continue: Energy yields once again increased due to higher bifacialities and improved temperature coefficients, but LID degradation worsened slightly, likely due to the increase in new cell factories.

Cell cracking. Credit: Kiwa PVEL

Available online, the 2026 PV Module Reliability Scorecard features a free Top Performer search tool, where users can get detailed results by manufacturer, module type, and test category, as well as export the list of Top Performers for further analysis.

“Amid growing complexity across the global energy landscape, we’re pleased to unveil this year’s list of Top Performers,” said Kevin Gibson, Managing Director of Kiwa PVEL. “While we’re seeing continued improvements in performance and energy yield, the rise in failure rates highlights the importance of independent, data-driven validation. In a market defined by rapid innovation and cost pressures, these insights help stakeholders better assess risk, differentiate quality, and make more confident long-term investment decisions.”

To be eligible for the 2026 Scorecard, manufacturers must have completed the PQP sample production factory witness after November 1, 2024; submitted at least two factory-witnessed PV module samples to all PQP reliability tests, as per Kiwa PVEL’s BOM test requirements; and have new Top Performer results that were not included in the 2025 Scorecard.

Source link

Previous Post

6 Requirements for Rooftop Solar Installation

Next Post

Detection device aims to stop copper theft on solar projects

Next Post
Detection device aims to stop copper theft on solar projects

Detection device aims to stop copper theft on solar projects

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Otovo acquires solar O&M brand SunSystem Technology

Otovo acquires solar O&M brand SunSystem Technology

27/05/2026
Detection device aims to stop copper theft on solar projects

Detection device aims to stop copper theft on solar projects

27/05/2026
Latest PV Module Reliability Scorecard shows unsettling uptick in failures

Latest PV Module Reliability Scorecard shows unsettling uptick in failures

27/05/2026
6 Requirements for Rooftop Solar Installation

6 Requirements for Rooftop Solar Installation

27/05/2026

Recent News

Otovo acquires solar O&M brand SunSystem Technology

Otovo acquires solar O&M brand SunSystem Technology

27/05/2026
Detection device aims to stop copper theft on solar projects

Detection device aims to stop copper theft on solar projects

27/05/2026
Latest PV Module Reliability Scorecard shows unsettling uptick in failures

Latest PV Module Reliability Scorecard shows unsettling uptick in failures

27/05/2026
6 Requirements for Rooftop Solar Installation

6 Requirements for Rooftop Solar Installation

27/05/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News