News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Arevon completes one of country’s first utility-scale solar peaker plants

admin by admin
25/11/2024
in Solar Contractors
0
Arevon completes one of country’s first utility-scale solar peaker plants
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Share

Arevon Energy hosted a ribbon-cutting ceremony to mark the start of operations at its Vikings Solar-plus-Storage Project in Imperial County, California, near Holtville. The $529 million project includes 157 MWDC of solar coupled with 150 MW/600 MWh of battery energy storage.

Vikings, one of the first utility-scale solar peaker plants in the U.S., shifts low-cost daytime solar energy to higher-cost peak demand periods, including late afternoons and evenings. Its battery storage system can rapidly adjust capacity in seconds, an essential component for addressing critical demand challenges.

The ribbon-cutting event held this week celebrated the collaborative efforts of the project’s stakeholders to bring the project into operations and acknowledged the community support to further California’s renewable energy goals.

“Vikings’ advanced design sets the standard for safe and reliable solar-plus-storage configurations,” said Kevin Smith, CEO at Arevon. “The project incorporates solar panels, trackers and batteries that showcase the growing strength of U.S. renewable energy manufacturing. Its completion marks a significant milestone for Arevon, as we continue to meet California’s clean energy needs while advancing energy security and independence nationwide.”

The project helps uses products from key U.S. manufacturers, including: Megapack battery energy storage systems manufactured by Tesla in Lathrop, California; First Solar thin film photovoltaic solar panels and Nextracker smart solar trackers. San Diego-headquartered SOLV Energy led the engineering, procurement and construction activities.

San Diego Community Power is the project’s offtaker, and through a long-term agreement with Arevon, the energy from the Vikings Solar-plus-Storage Project will contribute to serving their nearly 1 million customers. The companies have also executed a commercial agreement for Arevon’s 200-MW Avocet Energy Storage Project located in the City of Carson, California, which is expected to start construction in early 2025.

Vikings, which was named after the Holtville High School mascot, provided scholarships for deserving Holtville High School students to use for college tuition costs, which the Arevon team presented at an annual awards ceremony. The company also sponsors the annual Carrot Festival and remains committed to being an active member of the community throughout the project’s anticipated multi-decade life.

News item from Arevon

Source link

Previous Post

Solar and EV: Charging Options and Benefits

Next Post

New software aims to cut residential solar contract cancellations

Next Post
New software aims to cut residential solar contract cancellations

New software aims to cut residential solar contract cancellations

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Solar power has provided more new generating capacity than any other source for two years straight

Solar power has provided more new generating capacity than any other source for two years straight

31/10/2025
Illinois legislature passes Clean & Reliable Grid Affordability Act

Illinois legislature passes Clean & Reliable Grid Affordability Act

31/10/2025
Cobalt catalyst breakthrough advances photocatalytic hydrogen peroxide production

Cobalt catalyst breakthrough advances photocatalytic hydrogen peroxide production

31/10/2025
New molten salt repair process recycles high-performance electric vehicle batteries

New molten salt repair process recycles high-performance electric vehicle batteries

30/10/2025

Recent News

Solar power has provided more new generating capacity than any other source for two years straight

Solar power has provided more new generating capacity than any other source for two years straight

31/10/2025
Illinois legislature passes Clean & Reliable Grid Affordability Act

Illinois legislature passes Clean & Reliable Grid Affordability Act

31/10/2025
Cobalt catalyst breakthrough advances photocatalytic hydrogen peroxide production

Cobalt catalyst breakthrough advances photocatalytic hydrogen peroxide production

31/10/2025
New molten salt repair process recycles high-performance electric vehicle batteries

New molten salt repair process recycles high-performance electric vehicle batteries

30/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News