News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

DTE Energy issues 1-GW RFP for solar, wind projects

admin by admin
18/05/2026
in Solar Contractors
0
UMass study finds states approve most solar projects in under 1 year
0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

Share

Utility energy company DTE Energy is requesting proposals for 1 GW of renewable power projects in Michigan. These wind and solar projects must be completed by December 31, 2029 and interconnect to the Midcontinent Independent System Operator or DTE distribution system.

DTE will host a pre-request for proposal conference on May 26. Project bids are due on Aug. 13, with contracts executed in early 2027.

These renewable energy projects will support DTE Electric’s Clean Vision Integrated Resource Plan. DTE’s current renewable energy output powers more than 900,000 homes, and the company hopes to increase that to 6 million households by 2042.

News item from DTE Energy

Source link

Previous Post

Ford Energy signs 20-GWh BESS supply deal with EDF

Next Post

Enphase localizes battery software for reducing power loss

Next Post
Vistra adds Enphase batteries to Texas VPP program

Enphase localizes battery software for reducing power loss

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Vistra adds Enphase batteries to Texas VPP program

Enphase localizes battery software for reducing power loss

18/05/2026
UMass study finds states approve most solar projects in under 1 year

DTE Energy issues 1-GW RFP for solar, wind projects

18/05/2026
Ford formally launches grid-scale battery business Ford Energy

Ford Energy signs 20-GWh BESS supply deal with EDF

18/05/2026
Southeast utilities NextEra Energy and Dominion Energy to merge

Southeast utilities NextEra Energy and Dominion Energy to merge

18/05/2026

Recent News

Vistra adds Enphase batteries to Texas VPP program

Enphase localizes battery software for reducing power loss

18/05/2026
UMass study finds states approve most solar projects in under 1 year

DTE Energy issues 1-GW RFP for solar, wind projects

18/05/2026
Ford formally launches grid-scale battery business Ford Energy

Ford Energy signs 20-GWh BESS supply deal with EDF

18/05/2026
Southeast utilities NextEra Energy and Dominion Energy to merge

Southeast utilities NextEra Energy and Dominion Energy to merge

18/05/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News