News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Fluence to EPC 800-MWh energy storage project in California

admin by admin
14/07/2026
in Solar Contractors
0
Fluence boosts Smartstack BESS storage capacity to 10 MWh
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Fluence Energy will serve as the EPC on the Rexford 2 energy storage project in Tulare County, California. Avantus is developing the 200 MW/800-MWh project that is paired with a solar facility.

Credit: Fluence

Fluence will deploy its four-hour duration Smartstack system incorporating U.S. domestic content. The system will utilize Fluence’s network of partner manufacturing facilities in states including Utah, South Carolina and Texas, where key components such as battery cells, modules, enclosures and thermal management systems are produced. By drawing on this U.S.-based manufacturing network, the project will support the continued advancement of domestically produced energy storage technology.

“Delivering a project of this magnitude requires deep expertise to help ensure long-term performance. By combining our end-to-end EPC capabilities with our advanced, U.S.-built Smartstack solution, we are streamlining deployment for Avantus,” said John Zahurancik, Chief Customer Success Officer at Fluence. “We are proud to leverage our proven track record to build a highly reliable and flexible power foundation for California’s energy future.”

“Providing affordable, reliable clean energy solutions at scale requires the right partners. Our work with Fluence on Rexford 2 will strengthen the grid, build domestic supply chains, and bring much-needed energy capacity to California,” said Tony Frontino, Executive Vice President of Strategic Sourcing and Asset Management at Avantus.

Rexford 2 is expected to create more than 500 union jobs at peak construction, in addition to permanent local operations roles. The project is projected to generate hundreds of millions of dollars in local tax revenue for Tulare County, supporting public services and infrastructure. Additionally, Rexford 2 will be constructed on previously disturbed land, minimizing environmental impacts.

Construction is expected to begin in 2027, and the project is targeted to reach commercial operation in late 2028.

News item from Fluence Energy

Source link

Previous Post

Vavada online casino w Polsce – wersja mobilna

Next Post

Vermeer’s latest material transporter is ideal for solar pile installation

Next Post
Vermeer’s latest material transporter is ideal for solar pile installation

Vermeer's latest material transporter is ideal for solar pile installation

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Vermeer’s latest material transporter is ideal for solar pile installation

Vermeer’s latest material transporter is ideal for solar pile installation

14/07/2026
Fluence boosts Smartstack BESS storage capacity to 10 MWh

Fluence to EPC 800-MWh energy storage project in California

14/07/2026

Vavada online casino w Polsce – wersja mobilna

13/07/2026

Онлайн казино Dragon Money (Драгон Мани) 2026 – бонусные предложения

13/07/2026

Recent News

Vermeer’s latest material transporter is ideal for solar pile installation

Vermeer’s latest material transporter is ideal for solar pile installation

14/07/2026
Fluence boosts Smartstack BESS storage capacity to 10 MWh

Fluence to EPC 800-MWh energy storage project in California

14/07/2026

Vavada online casino w Polsce – wersja mobilna

13/07/2026

Онлайн казино Dragon Money (Драгон Мани) 2026 – бонусные предложения

13/07/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News