News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Vermont utility approved for 5-MW energy storage project

admin by admin
08/05/2024
in Solar Contractors
0
Vermont utility approved for 5-MW energy storage project
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Not-for-profit public utility Morrisville Water and Light (MWL) is bolstering its grid reliability after the unanimous approval from its board of trustees for an energy storage service agreement with Encore Renewable Energy for the development of a 5-MW battery storage project in Morrisville, Vermont.

“We are thrilled to embark on this innovative partnership with Encore,” said Scott Johnstone, GM at MWL. “This project underscores our commitment to delivering reliable, affordable and sustainable energy solutions for our community.”

The project includes the installation of a 4.96-MW battery system near the Salvage Yard Solar project, capable of providing 22,000 kWh on a full charge. This substantial capacity, approximately 60% of MWL’s typical peak demand, positions MWL to use the batteries for various purposes, including voltage spike absorption, peak demand reduction, participation in the ISO NE capacity market and grid resilience during emergencies such as brownouts.

Additionally, the energy storage system will let MWL engage in energy arbitrage, optimizing energy costs by charging the batteries during off-peak hours and discharging them during periods of high demand.

“Providing energy storage services from this system will create significant cost savings for MWL and reduce the carbon intensity of the grid during times of peak demand,” said Jesse Stowell, Encore’s CCO. “This partnership is a prime example of how communities can become leaders in the clean energy transition and deliver smart energy solutions to their customers.”

The project is scheduled to commence operations in November 2026.

“This project is a critical step forward in our transition to a clean energy future,” Johnstone said. “With the shifting landscape of energy generation in the state, including a state policy that discourages hydro power, both from Hydro Quebec and more locally our Green River hydro facility, combined with the intermittent nature of solar and wind energy, battery storage is emerging as a crucial component in enhancing reliability and managing costs so we can keep rates affordable for our customers.”

News item from Encore Renewable Energy

Source link

Previous Post

Tigo rolls out new MLPE for high-powered solar panels

Next Post

Sungrow SG Series vs. Growatt MIN Series

Next Post
Sungrow SG Series vs. Growatt MIN Series

Sungrow SG Series vs. Growatt MIN Series

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
The entire solar supply chain has now been reshored in the US

The entire solar supply chain has now been reshored in the US

29/10/2025
Say “no” to a solar customer bill of rights

Say “no” to a solar customer bill of rights

29/10/2025
The US is making solar wafers again at Corning’s Michigan plant

The US is making solar wafers again at Corning’s Michigan plant

29/10/2025
24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

29/10/2025

Recent News

The entire solar supply chain has now been reshored in the US

The entire solar supply chain has now been reshored in the US

29/10/2025
Say “no” to a solar customer bill of rights

Say “no” to a solar customer bill of rights

29/10/2025
The US is making solar wafers again at Corning’s Michigan plant

The US is making solar wafers again at Corning’s Michigan plant

29/10/2025
24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

29/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News