News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Salt River Project and Flatland Storage plan 200-MW BESS in Arizona

admin by admin
19/11/2024
in Solar Contractors
0
Salt River Project and Flatland Storage plan 200-MW BESS in Arizona
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Share

Salt River Project (SRP) and Flatland Storage, a subsidiary of EDP Renewables North America (EDPR NA) have entered into an agreement to provide 200 MW of new energy storage to Arizona’s grid. The Flatland Energy Storage Project will be a 200-MW/800-MWh battery energy storage system located near Coolidge, Arizona. The project will use Tesla lithium-ion battery energy storage systems.

Scheduled to be online in 2025, the facility will have enough capacity to power up to 45,000 homes for four hours during peak electricity demand periods. The batteries will absorb excess energy when customer demand is lower and store it for use during times of peak demand.

“Battery energy storage is an essential piece of SRP’s plan to decarbonize our portfolio and maximize the amount of renewable energy delivered to our customers,” said Bobby Olsen, SRP associate general manager and chief planning, strategy and sustainability executive.

This is SRP’s second project in partnership with EDPR NA. The first, Brittlebush Solar Park, provides 200 MW of solar energy to SRP customers. The Flatland Energy Storage Project is located within the Brittlebush Solar Park. The location will allow the battery to store energy from the grid or from the solar facility to best match the output to times of highest customer demand.

“We’re excited to be partnering with SRP on the largest utility-scale storage project in the EDP Group’s global portfolio to date,” said Sandhya Ganapathy, CEO of EDP Renewables North America. “Storage is key to modernizing the US power grid and is a requisite in accelerating the adoption of renewable energy, while boosting grid reliability and resiliency.”

News item from the Salt River Project

Source link

Previous Post

Adapture Renewables completes 14.6-MW Virginia solar project

Next Post

Xcel Energy completes first phase of 710-MW Minnesota solar project

Next Post
Xcel Energy completes first phase of 710-MW Minnesota solar project

Xcel Energy completes first phase of 710-MW Minnesota solar project

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Selling Your Home With Solar Panels

Selling Your Home With Solar Panels

29/10/2025
Second-Life Batteries: Extending Value Beyond EVs

Second-Life Batteries: Extending Value Beyond EVs

29/10/2025
Connecticut trade school system to install seven solar projects totaling 4.6 MW

Connecticut trade school system to install seven solar projects totaling 4.6 MW

29/10/2025
NovaSource opens solar and storage O&M training center in Arizona

NovaSource opens solar and storage O&M training center in Arizona

29/10/2025

Recent News

Selling Your Home With Solar Panels

Selling Your Home With Solar Panels

29/10/2025
Second-Life Batteries: Extending Value Beyond EVs

Second-Life Batteries: Extending Value Beyond EVs

29/10/2025
Connecticut trade school system to install seven solar projects totaling 4.6 MW

Connecticut trade school system to install seven solar projects totaling 4.6 MW

29/10/2025
NovaSource opens solar and storage O&M training center in Arizona

NovaSource opens solar and storage O&M training center in Arizona

29/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News