News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

New California arena will sport 797-kW solar project

admin by admin
07/12/2023
in Solar Contractors
0
New California arena will sport 797-kW solar project
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Frontwave Arena, the new 7,500 capacity venue in North San Diego County, California, has inked a local partnership with Baker Electric, for a renewable energy project that includes a fully integrated rooftop solar system array with a large-scale battery energy storage system for the sports and entertainment venue, and has signed a power purchase agreement with DSD Renewables to use the renewable energy produced at the site.

Credit: Frontwave Arena

“We are focusing on excellence in every aspect of development – from sustainable design to fan experience, from technology to community engagement,” said Josh Elias, COO of Frontwave Arena. “The solar installation is part of Frontwave Arena’s broader sustainability efforts to minimize the environmental impact of the arena. We have also committed to reducing water consumption, waste production and greenhouse gas emissions.”

Baker Electric will install a solar + storage project composed of a 1,350-panel, 797-kWDC solar system and 500-kW/1,100-kWh two-hour battery system.

Frontwave Arena, which is on schedule to open next summer, will be home to the 16-time champion indoor soccer team San Diego Sockers and configured to accommodate all types of indoor sports, concerts and community events. Frontwave Arena was designed to be the centerpiece of the Oceanside’s El Corazon, a 465-acre district where more than 80% of the property has been set aside for habitat and recreation.

“Baker Electric is excited to partner and assist with the development of a local landmark like Frontwave Arena,” said Scott Williams, Baker Electric executive VP. “We appreciate that not only are Josh and his team building a centerpiece of entertainment for the North County community, but they are not skipping any steps in consideration of the environmental impact of operating a facility of this size.”

Baker’s Renewables division focuses Baker’s engineering, procurement and construction project delivery methods on the utility-scale and commercial-industrial sectors, and is an Authorized Developer for DSD’s Developer Network. DSD will own, operate and maintain the solar and energy storage installation at Frontwave Arena.

News item from DSD Renewables

Source link

Previous Post

Pearl Certification releases IRA rebate calculator for homeowners

Next Post

Gov. Pritzker celebrates northern Illinois’s 100th community solar project

Next Post
Gov. Pritzker celebrates northern Illinois’s 100th community solar project

Gov. Pritzker celebrates northern Illinois's 100th community solar project

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

26/10/2025
Swift Solar advances defense operations with US-made perovskite solar panels

Swift Solar advances defense operations with US-made perovskite solar panels

26/10/2025
New method harnesses solar-powered biofilms to eliminate soil pollutants

New method harnesses solar-powered biofilms to eliminate soil pollutants

26/10/2025
Breakthrough double-layer design enhances silicon battery performance in electric vehicles

Breakthrough double-layer design enhances silicon battery performance in electric vehicles

25/10/2025

Recent News

28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

26/10/2025
Swift Solar advances defense operations with US-made perovskite solar panels

Swift Solar advances defense operations with US-made perovskite solar panels

26/10/2025
New method harnesses solar-powered biofilms to eliminate soil pollutants

New method harnesses solar-powered biofilms to eliminate soil pollutants

26/10/2025
Breakthrough double-layer design enhances silicon battery performance in electric vehicles

Breakthrough double-layer design enhances silicon battery performance in electric vehicles

25/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News