News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Idaho solar project partners commit $375,000 in scholarships to local colleges

admin by admin
19/11/2025
in Solar Contractors
0
Idaho solar project partners commit $375,000 in scholarships to local colleges
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Partners on the Pleasant Valley Solar 2 project in Idaho have joined together to commit $375,000 to support students at the College of Western Idaho and Boise State University through two workforce development scholarship programs. Each school will receive $187,500 to expand opportunities for Idaho students preparing for careers that strengthen the state’s economy and energy future.

Contractors rPlus Energies, Sundt Renewables and BHI, insurance agent Alan Stearns; and solar panel supplier Thornova Solar have contributed to the “Local First” and “Energy First” scholarship programs.

The Local First – Pleasant Valley Solar 2 Scholarship, awarded in partnership with College of Western Idaho, supports students pursuing any certificate or associate degree, with an emphasis on keeping skilled talent in Idaho communities.

“This scholarship directly strengthens Idaho’s workforce by helping more students gain the skills and education needed for their careers,” said Gordon Jones, President of CWI. “The $187,500 commitment will open doors for CWI students, fuel business growth and support innovation across our state.”

The Energy First – Pleasant Valley Solar 2 Scholarship, awarded in partnership with Boise State University, supports students pursuing degrees in energy-related fields such as engineering or construction management.

“We are incredibly grateful for Pleasant Valley Solar 2 Partners’ continued generosity and leadership with this scholarship,” said Argia Beristain, CEO of the Boise State University Foundation. “Energy-related careers are of high interest to our students and of high importance to our state. This scholarship opens the doors for our students while also helping to develop Idaho’s workforce and economy.”

Both scholarships continue the Local First and Energy First programs established during the Pleasant Valley Solar 1 project, which raised $123,000 in 2024 for College of Western Idaho and Boise State University students.

Since launching in 2022, the Local First and Energy First scholarship series, implemented by rPlus Energies in every community where they begin construction, has contributed more than $1 million to support local students and strengthen host communities.

Pleasant Valley Solar 2 is a 125-MW solar facility under construction in Ada County, Idaho. The project will create roughly 200 construction jobs and is expected to begin operations by summer 2026.

News item from rPlus

Source link

Previous Post

Volvo partners with dcbel to allow bidirectional charging of EX90 in US

Next Post

Versiris Energy completes logistically tricky rooftop solar project

Next Post
Versiris Energy completes logistically tricky rooftop solar project

Versiris Energy completes logistically tricky rooftop solar project

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Is It Viable for Rural Australia?

Is It Viable for Rural Australia?

26/11/2025
How to Ensure Your Solar Warranties Stay Valid Long After Install

How to Ensure Your Solar Warranties Stay Valid Long After Install

26/11/2025
V2Grid Australia Makes History with the Nation’s First CEC-Certified Bidirectional EV Charger

V2Grid Australia Makes History with the Nation’s First CEC-Certified Bidirectional EV Charger

26/11/2025
18 California legislators ask CPUC to address solar interconnection delays

18 California legislators ask CPUC to address solar interconnection delays

26/11/2025

Recent News

Is It Viable for Rural Australia?

Is It Viable for Rural Australia?

26/11/2025
How to Ensure Your Solar Warranties Stay Valid Long After Install

How to Ensure Your Solar Warranties Stay Valid Long After Install

26/11/2025
V2Grid Australia Makes History with the Nation’s First CEC-Certified Bidirectional EV Charger

V2Grid Australia Makes History with the Nation’s First CEC-Certified Bidirectional EV Charger

26/11/2025
18 California legislators ask CPUC to address solar interconnection delays

18 California legislators ask CPUC to address solar interconnection delays

26/11/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News