News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Harvest can continue on solar project built at California farm

admin by admin
16/04/2024
in Solar Contractors
0
Harvest can continue on solar project built at California farm
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

MCE has partnered with Renewable America (RNA) to power on another 1 MW solar project in Marin County, California. The 4.5-acre Fallon Two Rock solar farm is MCE’s latest local project, generating an estimated 2,300 MWh and powering 400 homes annually.

The Fallon Two Rock solar project. Renewable America

“We’re thrilled to celebrate Fallon’s commercial operation and toast the partnership with MCE at the ribbon-cutting,” said Ardeshir Arian, president and CEO of RNA. “Renewable America’s motto ‘Think Local. Act Local’, drives us to prioritize local projects like Fallon Two Rock that positively impact local communities. This is our first project with MCE, supporting local clean energy generation and committing to fast-tracking progress toward a clean energy future in California.”

The Fallon Two Rock project came online in January 2024 as part of MCE’s 48 MW of local energy generation. RNA Services, a subsidiary of RNA, served as the engineering, procurement and construction partner and will continue its role in operations and maintenance.

The project is also approved for agricultural compatible land use, allowing continued agricultural operations while generating carbon-free electricity. Several local companies were employed for the project’s construction, including Sunstall and Sierra Tree Company.

Fallon Two Rock was built with nearly 4,000 hours of prevailing wage labor. RNA has also committed $20,000 to MCE for local workforce development.

“Clean energy is just one part of the transition to a sustainable future,” said Katie Rice, MCE board director and Marin County supervisor. “The additional funding RNA committed will help MCE grow the clean energy economy, providing training opportunities for local residents to enter the green workforce.”

Fallon Two Rock is MCE’s 16th Feed-In Tariff project to come online in the Bay Area. The FIT program incentivizes local renewable energy development and job creation by paying above market rate for renewable energy generation in MCE’s service area.

News item from MCE

Source link

Previous Post

OMCO Solar starts operations at 2nd factory in Alabama

Next Post

Burns & McDonnell to EPC two solar projects in Iowa for Alliant Energy

Next Post
Burns & McDonnell to EPC two solar projects in Iowa for Alliant Energy

Burns & McDonnell to EPC two solar projects in Iowa for Alliant Energy

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Efficiency and Rebates in the Australian Market

Efficiency and Rebates in the Australian Market

28/10/2025
Coral Reef Partners completes 2-MW solar project in central Pennsylvania

Coral Reef Partners completes 2-MW solar project in central Pennsylvania

28/10/2025
Enphase now supports completely off-grid solar + storage systems

Enphase now supports completely off-grid solar + storage systems

28/10/2025
Bipartisan governors group asks Congress for tech-neutral energy permitting reforms

Bipartisan governors group asks Congress for tech-neutral energy permitting reforms

28/10/2025

Recent News

Efficiency and Rebates in the Australian Market

Efficiency and Rebates in the Australian Market

28/10/2025
Coral Reef Partners completes 2-MW solar project in central Pennsylvania

Coral Reef Partners completes 2-MW solar project in central Pennsylvania

28/10/2025
Enphase now supports completely off-grid solar + storage systems

Enphase now supports completely off-grid solar + storage systems

28/10/2025
Bipartisan governors group asks Congress for tech-neutral energy permitting reforms

Bipartisan governors group asks Congress for tech-neutral energy permitting reforms

28/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News