News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

EnerSys announces plans for 4-GWh lithium cell factory in South Carolina

admin by admin
14/02/2024
in Solar Contractors
0
EnerSys announces plans for 4-GWh lithium cell factory in South Carolina
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Share

Battery maker EnerSys has selected Greenville, South Carolina, to develop a 4-GWh lithium-ion cell factory.

An off-grid installation in Wyoming using EnerSys components.

EnerSys has applied for an incentive package through South Carolina and Greenville County valued at approximately $200 million, which includes a combination of short-term and long-term incentives. The company intends to use a portion of those proceeds, along with the Inflation Reduction Act 45X tax benefits and potential additional federal funding, to make a $500 million investment with the potential to create 500 new jobs.

EnerSys is evaluating the development of a 500,000-ft2 manufacturing facility on approximately 140 acres in the Augusta Grove business park in Greenville. The operation, which would be the company’s second in South Carolina, would manufacture various form factors of lithium-ion cells for commercial, industrial and defense applications. EnerSys is the parent company behind Outback Power.

“We recognize Greenville as an emerging hub for high-tech companies with an attractive talent pool in a thriving community. EnerSys is accelerating the global clean energy transition by significantly expanding our production of lithium-ion batteries across a broad range of end markets and applications. With the support of South Carolina and Greenville County this factory will help us meet our customers’ needs, including those with specific manufacturing requirements for domestic sourced batteries,” said  David M. Shaffer, EnerSys president and CEO.

EnerSys last year entered into a non-binding memorandum of understanding (MOU) with Verkor SAS, a European battery tech company, to work together on a U.S. lithium plant. Verkor is building a 16-GWh battery cell and module factory in France that should start production in 2025. Verkor mainly supplies EV manufacturers, such as Renault Group.

EnerSys is targeting construction to begin on the South Carolina plant in early 2025 with operations commencing in late 2027.

News item from EnerSys

Source link

Previous Post

California assemblymember introduces bill to repeal NEM 3.0

Next Post

Devastating Storm Plunges Victoria into Power Outages, Hampering Bushfire Fight

Next Post
Devastating Storm Plunges Victoria into Power Outages, Hampering Bushfire Fight

Devastating Storm Plunges Victoria into Power Outages, Hampering Bushfire Fight

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
The entire solar supply chain has now been reshored in the US

The entire solar supply chain has now been reshored in the US

29/10/2025
Say “no” to a solar customer bill of rights

Say “no” to a solar customer bill of rights

29/10/2025
The US is making solar wafers again at Corning’s Michigan plant

The US is making solar wafers again at Corning’s Michigan plant

29/10/2025
24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

29/10/2025

Recent News

The entire solar supply chain has now been reshored in the US

The entire solar supply chain has now been reshored in the US

29/10/2025
Say “no” to a solar customer bill of rights

Say “no” to a solar customer bill of rights

29/10/2025
The US is making solar wafers again at Corning’s Michigan plant

The US is making solar wafers again at Corning’s Michigan plant

29/10/2025
24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

29/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News