News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Enel completes 556-MW solar array co-located at operational 355-MW BESS

admin by admin
06/11/2025
in Solar Contractors
0
Enel completes 556-MW solar array co-located at operational 355-MW BESS
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

The 556-MW GulfStar solar plant in Wharton County, Texas. Credit: Enel

Enel North America completed its largest power plant in the United States with the start of operations of the 556-MWDC GulfStar solar plant in Wharton County, Texas. It is co-located with an operational 355-MW battery energy storage system (BESS), which reached initial commercial operation in late 2024.

The GulfStar solar and BESS facilities are expected to generate over $200 million in combined local tax payments and income for landowners over their lifetimes. More than 1,200 workers were involved in GulfStar’s construction.

Vegetation at GulfStar Solar will be managed through sheep grazing, a sustainable dual-use solar practice that Enel expanded through the largest solar grazing agreement signed in the United States.

News item from Enel

Source link

Previous Post

Is Financing Solar Installation Worth It?

Next Post

Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

Next Post
Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Tigo goes all-digital for MLPE install manuals

Tigo goes all-digital for MLPE install manuals

06/11/2025
Can Microgrids Reduce Blackouts in Australian Cities?

Can Microgrids Reduce Blackouts in Australian Cities?

06/11/2025
Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

06/11/2025
Enel completes 556-MW solar array co-located at operational 355-MW BESS

Enel completes 556-MW solar array co-located at operational 355-MW BESS

06/11/2025

Recent News

Tigo goes all-digital for MLPE install manuals

Tigo goes all-digital for MLPE install manuals

06/11/2025
Can Microgrids Reduce Blackouts in Australian Cities?

Can Microgrids Reduce Blackouts in Australian Cities?

06/11/2025
Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

Matrix Renewables, SOLV Energy power on Stillhouse Solar project in Texas

06/11/2025
Enel completes 556-MW solar array co-located at operational 355-MW BESS

Enel completes 556-MW solar array co-located at operational 355-MW BESS

06/11/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News