News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Cleveland puts out RFI for equipment suppliers on upcoming 63-MW solar project

admin by admin
23/12/2024
in Solar Contractors
0
Cleveland puts out RFI for equipment suppliers on upcoming 63-MW solar project
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Share

Cuyahoga County of Ohio has released a request for information (RFI) for an upcoming 63-MW solar project in the area. Cuyahoga Green Energy, on behalf of the county, is soliciting information from firms interested in becoming an equipment provider on the project that is developed through the EPA’s Climate Pollution Reduction Grants (CPRG) program.

Cuyahoga Green Energy, the electric distribution utility, has been awarded a U.S. EPA grant totaling $130 million, which will be used to construct 63 MW of solar, alongside 10 MW of battery storage, on six brownfields and/or former landfill sites across the Cleveland metropolitan area by October of 2029. This RFI aims to identify and establish lines of contact with manufacturers interested in providing the requisite materials and services for the successful completion of this project by the deadline set by EPA.

Specifically, the county aims to competitively procure solar panels, racking systems, inverters, and other relevant equipment to develop these projects with the following qualifications:

  1. Panels must be both Build America, Buy America (BABA) certified AND Buy American Act compliant.
  2. Panels must be compatible with landfill and brownfield solar development – the county is currently searching for ground-mount panels with ballasted racking systems, but is open to other viable alternatives if present.
  3. Panels must have a satisfactory conversion efficiency to accommodate utility-scale solar within the confines of the available grant funding.
  4. Inverters must be satisfactorily efficient and reliable to minimize losses over the lifespan of the system.
  5. Mounting hardware and panels must be able to withstand high winds and increasing severe weather events typical of the local geography.

Responses must be submitted via e-mail to the issuing department contact (Thomas Pavich, tpavich@cuyahogacounty.gov) with the RFI name and number in the subject line. Responses are due no later than 11 a.m. on Thursday, February 6, 2025. More details here.

Source link

Previous Post

No Deposit Benefit Casino Usa 2024 Keep What You Succeed! –

Next Post

The Tragic, Real-life Story Of Johnny Cas –

Next Post
Migliori Casinò Online Italian –

The Tragic, Real-life Story Of Johnny Cas -

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
GreenPowerMonitor releases monitoring software for multi-tech portfolios

GreenPowerMonitor releases monitoring software for multi-tech portfolios

30/10/2025
New 685-MW solar project in Utah will power Meta operations

New 685-MW solar project in Utah will power Meta operations

30/10/2025
New Battery Brands Joins WA’s Rebate Scheme, Giving Homeowners More Choice

New Battery Brands Joins WA’s Rebate Scheme, Giving Homeowners More Choice

29/10/2025
Solar research team targets safer future for solar panels and groundwater

Solar research team targets safer future for solar panels and groundwater

29/10/2025

Recent News

GreenPowerMonitor releases monitoring software for multi-tech portfolios

GreenPowerMonitor releases monitoring software for multi-tech portfolios

30/10/2025
New 685-MW solar project in Utah will power Meta operations

New 685-MW solar project in Utah will power Meta operations

30/10/2025
New Battery Brands Joins WA’s Rebate Scheme, Giving Homeowners More Choice

New Battery Brands Joins WA’s Rebate Scheme, Giving Homeowners More Choice

29/10/2025
Solar research team targets safer future for solar panels and groundwater

Solar research team targets safer future for solar panels and groundwater

29/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News