News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

admin by admin
13/02/2026
in Solar Contractors
0
California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Share

Long-duration energy storage developer Hydrostor has signed a 50-MW offtake agreement with California Community Power (CC Power) for the Willow Rock Energy Storage Center.

The 500-MW/4,000-MWh advanced compressed air energy storage (A-CAES) project can store energy for eight hours of continuous discharge to the grid, and will provide reliable capacity to the six community choice aggregator members of CC Power.

A rendering of the Willow Rock compressed-air LDES by Hydrostor.

“Hydrostor’s Willow Rock project brings much-needed grid benefits to California by providing reliable long-duration energy storage capacity using domestic content, off-the-shelf turbomachinery and only air and water to store energy,” said Alexander Morris, CC Power General Manager. “CC Power strives to advance California’s energy goals by contracting with novel, high-potential technologies and is excited to partner with Hydrostor on this innovative energy storage solution that improves reliability and diversifies California’s grid while supporting local employment and investment.”

The six CC Power members participating in the offtake agreement are CleanPowerSF, Peninsula Clean Energy, Redwood Coast Energy Authority, San Jose Clean Energy, Silicon Valley Clean Energy Authority and Valley Clean Energy Authority.

“Through this agreement with CC Power, we’re demonstrating how A‑CAES can be deployed at meaningful scale to meet emerging reliability needs while offering a cost‑competitive, infrastructure‑ready solution for utilities navigating rapid load growth,” added Jordan Cole, Hydrostor’s Chief Commercial Officer. “Willow Rock is a strong example of how our commercial strategy translates into real projects delivering significant value for customers and communities.”

The Willow Rock project received its California Energy Commission permit in December of last year, its franchise agreement from the Kern County Board of Supervisors earlier the same month, as well as a conditional letter of support from the Kern County Board of Supervisors in April of 2025. The project is expected to come online in 2030.

The Willow Rock Energy Storage Center is Hydrostor’s first utility-scale project being built in the United States, building on its operational project in Ontario, Canada. The company is developing another late-stage project in New South Wales, Australia, and has a 7-GW project pipeline globally, with projects in the United States, Australia, Canada and the UK.

Source link

Previous Post

Treasury issues FEOC guidance for energy project developers and domestic manufacturers

Next Post

EPA no longer considers greenhouse gases a pollutant

Next Post
EPA no longer considers greenhouse gases a pollutant

EPA no longer considers greenhouse gases a pollutant

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
EPA no longer considers greenhouse gases a pollutant

EPA no longer considers greenhouse gases a pollutant

13/02/2026
California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

13/02/2026
Treasury issues FEOC guidance for energy project developers and domestic manufacturers

Treasury issues FEOC guidance for energy project developers and domestic manufacturers

13/02/2026
Study maps path to cleaner terawatt scale solar manufacturing

Study maps path to cleaner terawatt scale solar manufacturing

12/02/2026

Recent News

EPA no longer considers greenhouse gases a pollutant

EPA no longer considers greenhouse gases a pollutant

13/02/2026
California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

13/02/2026
Treasury issues FEOC guidance for energy project developers and domestic manufacturers

Treasury issues FEOC guidance for energy project developers and domestic manufacturers

13/02/2026
Study maps path to cleaner terawatt scale solar manufacturing

Study maps path to cleaner terawatt scale solar manufacturing

12/02/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News