News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Burns & McDonnell to EPC two solar projects in Iowa for Alliant Energy

admin by admin
16/04/2024
in Solar Contractors
0
Burns & McDonnell to EPC two solar projects in Iowa for Alliant Energy
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Burns & McDonnell is the EPC contractor and will be self-performing construction for two Alliant Energy solar projects in Iowa: the 150-MW Wever project in Lee County and the 50-MW Creston project in Union County. The projects are expected to be placed in service later this year.

Piles on the Wever project

Burns & McDonnell is providing fully integrated services for the projects. The company recently completed EPC and self-perform construction for nine of Alliant Energy’s solar projects in Wisconsin.

“We are excited to build on the momentum of the nine sites we successfully delivered for Alliant Energy in Wisconsin,” says Jami Stone, construction project manager at Burns & McDonnell. “We look forward to continuing to build on this trust-based relationship to implement additional renewable energy projects for them.”

AZCO, the union construction subsidiary of Burns & McDonnell, is performing the construction. The majority of the workforce will come from local trades, including carpenters, laborers, operators and electricians. Peak labor is expected to reach 300 on the Wever project and 120 on the Creston project.

The value of an integrated approach is visible on the Wever project. Because of its location in a flood plain, extra planning, permitting and engineered solutions have been involved. Designers collaborated with construction professionals to prepare for 500-year flood levels. Burns & McDonnell proactively designed and installed a drain tile system in-house to accommodate the environmentally sensitive area, reduce the risk of flooding and mitigate potential challenges.

Other project highlights include applying new and innovative technologies to streamline construction, making it more efficient and environmentally sustainable. The project team will also install 3 miles of underground cable to interconnect the AC collection system at the Wever site with the closest existing electrical substation.

News item from Burns & McDonnell

Source link

Previous Post

Harvest can continue on solar project built at California farm

Next Post

PCL to build 48-MW Great Bend Solar project in Southern Ohio

Next Post
PCL to build 48-MW Great Bend Solar project in Southern Ohio

PCL to build 48-MW Great Bend Solar project in Southern Ohio

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
New report finds utility rate increase requests and approvals doubled in 2025

New report finds utility rate increase requests and approvals doubled in 2025

28/10/2025
MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

28/10/2025
Advances in semi-transparent solar cell technology drive future energy solutions for buildings

Advances in semi-transparent solar cell technology drive future energy solutions for buildings

28/10/2025
DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

28/10/2025

Recent News

New report finds utility rate increase requests and approvals doubled in 2025

New report finds utility rate increase requests and approvals doubled in 2025

28/10/2025
MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

28/10/2025
Advances in semi-transparent solar cell technology drive future energy solutions for buildings

Advances in semi-transparent solar cell technology drive future energy solutions for buildings

28/10/2025
DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

28/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News