News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Burns & McDonnell breaks ground on a utility’s first large-scale solar project

admin by admin
11/06/2024
in Solar Contractors
0
Burns & McDonnell breaks ground on a utility’s first large-scale solar project
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Burns & McDonnell has broken ground on a new 297-MWDC solar facility for Consumers Energy, the utility’s first large-scale solar project. Scheduled for completion in 2026, the project represents a key part of Consumers Energy’s plan to add 8,000 MW of utility-scale solar power by 2040.

Burns & McDonnell is leading the project, using an integrated engineer-procure-construct (EPC) approach. The integrated EPC scope of the firm also includes site permitting, substation construction and the interconnection generation tie. The Burns & McDonnell team consists of the firm’s union self-perform construction arm, AZCO, working closely with local and other Michigan-based union labor.

“We are excited to work with local trades and union halls across Michigan to build out solar within the state,” said Drew Powers, construction project manager at Burns & McDonnell. “This project not only helps Consumers Energy advance in renewable energy but also supports the local economy.”

Located across 1,900 acres, the Muskegon Solar Energy Center is expected to generate enough energy to power approximately 40,000 homes annually.

“Consumers Energy has some of the most ambitious clean energy goals in the nation and advancing projects like this put us on a clear path to achieving them,” said David Hicks, VP of clean energy development for Consumers Energy. “Every project we bring online helps lower bills for our customers in the long term while also providing significant tax revenue for the community and better serving our planet. That’s a win for everyone, and we’re proud to be partnering with Burns & McDonnell to see this project come to fruition.”

Some key components of the project include First Solar Series 7 modules, Array Technology trackers, Siemens Gamesa inverters and Shoals Technologies Group and CAB Solar Cable Management tools.

“We are excited to help build out solar and drive the low cost of energy and renewable penetration into the great state of Michigan,” said Scott Newland, senior VP of infrastructure at Burns & McDonnell.

News item from Burns & McDonnell

Source link

Previous Post

Startup launches online platform for residential PV system purchase – pv magazine USA

Next Post

MREA now an accredited training provider for six solar roles

Next Post
MREA now an accredited training provider for six solar roles

MREA now an accredited training provider for six solar roles

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
How Smart Meters Are Changing Solar Power in Australia

Why the Cheapest EV in Australia is Rarely the One Under $10,000

14/02/2026
How Smart Meters Are Changing Solar Power in Australia

1,200+ Rebate-Eligible Models You Can Choose From

13/02/2026
EPA no longer considers greenhouse gases a pollutant

EPA no longer considers greenhouse gases a pollutant

13/02/2026
California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

13/02/2026

Recent News

How Smart Meters Are Changing Solar Power in Australia

Why the Cheapest EV in Australia is Rarely the One Under $10,000

14/02/2026
How Smart Meters Are Changing Solar Power in Australia

1,200+ Rebate-Eligible Models You Can Choose From

13/02/2026
EPA no longer considers greenhouse gases a pollutant

EPA no longer considers greenhouse gases a pollutant

13/02/2026
California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

California power aggregators sign on for 50-MW slice of compressed-air long-duration energy storage

13/02/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News