News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Agilitas Energy completes install of 23.7-MWh standalone battery in Queens

admin by admin
07/11/2023
in Solar Contractors
0
Agilitas Energy completes install of 23.7-MWh standalone battery in Queens
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

Agilitas Energy has completed construction on the largest standalone energy storage system in Con Edison’s New York City and Westchester County service area. The project consists of a 4.8-MW/23.7-MWh lithium battery system installed in the Long Island City neighborhood in Queens.

“New York City is arguably the most complicated and challenging urban area to build an energy storage project with its regulatory hurdles and zoning restrictions, and I’m proud that our team’s diligence, ingenuity and leadership allowed us to become one of the only companies to successfully do so,” said Barrett Bilotta, President, CEO and Cofounder of Agilitas Energy. “This energy storage system will serve as a huge win for consumers as our project will enhance reliability, support the transition to a clean energy future and help defer the costs of building more infrastructure.”

Agilitas Energy has a 10-year contract with Con Edison to discharge up to four hours of stored energy during its peak demand period from May 1 through September 30. Con Edison can make daily requests for power with advance notice during a specified timeframe.

The project will enhance the grid’s reliability and resiliency by charging the batteries from the grid at off-peak hours, when there is less demand for power and costs are lower, and then discharging that energy to Con Edison customers when demand for power is higher. The project follows New York State’s mandate to accelerate the proliferation of storage across its grid, in pursuit of Gov. Kathy Hochul’s aggressive targets set last year to help fuel the energy transition.

The ESS was built to remain operable when the grid is under stress due to extreme heat, as customers use their air conditioners to stay comfortable. The project’s enhanced reliability design will ensure that the facility is able to deliver power at critical times.

In addition to fulfilling the May to September contract commitment to Con Edison, the project will sell energy into New York State’s wholesale market. The project is expected to be connected to the grid in 2024.

News item from Agilitas Energy

Source link

Previous Post

Utility-scale solar costs to rise, residential solar costs to decline – pv magazine USA

Next Post

Today’s Power breaks ground on 5-MW solar array for waste treatment facility

Next Post
Today’s Power breaks ground on 5-MW solar array for waste treatment facility

Today's Power breaks ground on 5-MW solar array for waste treatment facility

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
The entire solar supply chain has now been reshored in the US

The entire solar supply chain has now been reshored in the US

29/10/2025
Say “no” to a solar customer bill of rights

Say “no” to a solar customer bill of rights

29/10/2025
The US is making solar wafers again at Corning’s Michigan plant

The US is making solar wafers again at Corning’s Michigan plant

29/10/2025
24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

29/10/2025

Recent News

The entire solar supply chain has now been reshored in the US

The entire solar supply chain has now been reshored in the US

29/10/2025
Say “no” to a solar customer bill of rights

Say “no” to a solar customer bill of rights

29/10/2025
The US is making solar wafers again at Corning’s Michigan plant

The US is making solar wafers again at Corning’s Michigan plant

29/10/2025
24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

24.56kWh House Battery System: Two LFP.6144.G2 Units with Dedicated SRNE Inverters

29/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News