News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Eaton plans 370-kW solar-powered microgrid for new library in Connecticut

admin by admin
09/12/2025
in Solar Contractors
0
Eaton plans 370-kW solar-powered microgrid for new library in Connecticut
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Share

Architect’s renderings courtesy of the Town of Manchester, Connecticut.

Eaton announced it will deliver a 370-kW solar-powered microgrid for the new Manchester Public Library in Connecticut to help the structure reach zero net energy (ZNE)-ready status.

The newly constructed library will implement grid-interactive renewables, battery storage and electric vehicle (EV) charging — helping maximize energy savings and reduce strain on the local electric grid. Scheduled for completion in 2026, the project aims to achieve zero net energy (ZNE) ready status.

Using its “Buildings as a Grid” approach that enables flexible energy systems, Eaton is empowering the Town of Manchester to strategically balance energy production and consumption while enhancing grid flexibility. Eaton will synchronize the onsite renewables, energy storage and EV charging with local energy markets, allowing the library to optimize energy usage and enabling the utility to better manage peak demand and support the grid.

“The new Manchester Public Library showcases how smart energy management can reduce costs and demand on the grid while optimizing resilience and sustainability,” said Paul Ryan, VP and general manager of energy transition at Eaton. “We’re confident our proven intelligent power management solutions and expertise will benefit the Town of Manchester and its residents for decades to come.”

Eaton is delivering electrical infrastructure, turnkey engineering services and return on investment (ROI) modeling for the project. With its microgrid control solution and grid-interactive xStorage battery energy storage system (BESS), Eaton will help the library maximize onsite solar consumption and export excess electricity to support grid stability. Additionally, Eaton is leveraging its industry-first EV charging partnership with ChargePoint to provide vehicle charging infrastructure that helps intelligently reduce costs, effectively manage site power requirements and enhance reliability.

“Our community overwhelmingly supports our investment in this state-of-the-art library as a beacon of sustainability, innovation and education,” said Steve Stephanou, town manager at the Town of Manchester. “Eaton’s forward-thinking solutions and strong relationships with the project team have been essential to turn our goal of building Connecticut’s first net-zero public library into reality.”

The project is supported by federal tax credits, state and local funding and incentives provided through the Energy Storage Solutions program. This program is overseen by the Public Utilities Regulatory Authority (PURA), is paid for by electric ratepayers, and is administered by the Connecticut Green Bank, Eversource and the United Illuminating Company (UI). Learn more about how Eaton is helping electrify the grid-interactive buildings of the future.

News item from Eaton

Source link

Previous Post

Meter collars cut costs and simplify logistics on home solar + storage installations

Next Post

Construction begins on BayWa’s JVR Energy Park solar + storage project in California

Next Post
Construction begins on BayWa’s JVR Energy Park solar + storage project in California

Construction begins on BayWa's JVR Energy Park solar + storage project in California

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Afore AF Series Three-Phase Storage Inverters Now CEC Listed

Afore AF Series Three-Phase Storage Inverters Now CEC Listed

09/12/2025
The Holiday Load You Don’t See

The Holiday Load You Don’t See

09/12/2025
Construction begins on BayWa’s JVR Energy Park solar + storage project in California

Construction begins on BayWa’s JVR Energy Park solar + storage project in California

09/12/2025
Eaton plans 370-kW solar-powered microgrid for new library in Connecticut

Eaton plans 370-kW solar-powered microgrid for new library in Connecticut

09/12/2025

Recent News

Afore AF Series Three-Phase Storage Inverters Now CEC Listed

Afore AF Series Three-Phase Storage Inverters Now CEC Listed

09/12/2025
The Holiday Load You Don’t See

The Holiday Load You Don’t See

09/12/2025
Construction begins on BayWa’s JVR Energy Park solar + storage project in California

Construction begins on BayWa’s JVR Energy Park solar + storage project in California

09/12/2025
Eaton plans 370-kW solar-powered microgrid for new library in Connecticut

Eaton plans 370-kW solar-powered microgrid for new library in Connecticut

09/12/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News