News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Virginia report finds 16% of resi solar projects that begin permitting process are abandoned

admin by admin
02/10/2025
in Solar Contractors
0
Virginia report finds 16% of resi solar projects that begin permitting process are abandoned
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Share

The Environment Virginia Research & Policy Center released a new report, “A 21st-Century Permitting Regime for Rooftop Solar and Home Batteries in Virginia,” at the Virginia Clean Energy Summit. The report, co-authored with Permit Power and the Chesapeake Solar and Storage Association (CHESSA), details the current state of solar permitting in Virginia.

As energy demand skyrockets in Virginia, the report finds that the state is ill-equipped to meet the moment. An antiquated, patchwork system of solar permitting requirements across Virginia is contributing to delays and pushing up costs for homeowners.

“Needless red tape is holding Virginia back from reaching our rooftop solar potential. With instant permitting we can put solar panels on the roofs of our homes and connect them to the grid as fast and hassle-free as possible, without compromising quality or safety,” said Elly Wilson, state director of Environment Virginia Research & Policy Center.

Key findings of the report include:

  • 16% of residential solar projects that begin the permitting process are abandoned before completion, largely due to permitting barriers.
  • The median wait time for a residential solar permit is nine business days, with some cities and counties typically reaching as long as 18 or 24 business days.
  • The median time of the subsequent inspection process took an additional 13 days.
  • Permitting and related bureaucratic costs can add $6,000 to $7,000 in additional expenses to residential solar systems.
  • Residential solar costs roughly double what it would cost in Europe.
  • The difficulties associated with the permitting process are contributing to delayed residential solar adoption in Virginia.

The report points to instant permitting as a key way to modernize the residential solar permitting process — using an automated system for reviewing solar installation plans. These platforms ask solar installers detailed questions regarding the electrical, structural and fire safety of a proposed solar system and then check whether the project is in compliance with local codes.

“Residential solar is a valuable tool for Virginia. Solar helps families lower their energy bills. And the more energy made locally in Virginia, such as from residential solar, helps keep costs down for all Virginians,” said Robin Dutta, Executive Director of CHESSA. “Counties in Virginia should modernize their permit processes and resources, adopt automated permitting and work with the residential solar industry to help Commonwealth residents to fight this energy affordability crisis.”

News item from the Environment Virginia Research & Policy Center

Source link

Previous Post

Book a Solar Service Now, Protect Your Home From Electrical Fire

Next Post

Ultrafast stabilization of positive charges revealed in solar fuel catalyst

Next Post
French Guiana villagers seek UN help to stop solar project

Ultrafast stabilization of positive charges revealed in solar fuel catalyst

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Pole-mount agrivoltaics project installed at Puerto Rico coffee farm

Pole-mount agrivoltaics project installed at Puerto Rico coffee farm

27/10/2025
Renewable America cuts ribbon on 9.4-MW solar + storage portfolio in Humboldt County

Renewable America cuts ribbon on 9.4-MW solar + storage portfolio in Humboldt County

27/10/2025
AIKO Introduces the World’s First 500W Solar Panel Under 2m²

AIKO Introduces the World’s First 500W Solar Panel Under 2m²

27/10/2025
28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

26/10/2025

Recent News

Pole-mount agrivoltaics project installed at Puerto Rico coffee farm

Pole-mount agrivoltaics project installed at Puerto Rico coffee farm

27/10/2025
Renewable America cuts ribbon on 9.4-MW solar + storage portfolio in Humboldt County

Renewable America cuts ribbon on 9.4-MW solar + storage portfolio in Humboldt County

27/10/2025
AIKO Introduces the World’s First 500W Solar Panel Under 2m²

AIKO Introduces the World’s First 500W Solar Panel Under 2m²

27/10/2025
28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

28.6kWh House Battery System: Dual LFP.1433.F Units with Single Deye Inverter

26/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News