News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Clearway completes massive solar + storage complex in Riverside, California

admin by admin
17/04/2024
in Solar Contractors
0
Clearway completes massive solar + storage complex in Riverside, California
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Clearway Energy

Clearway Energy Group announced on April 17 that the Victory Pass and Arica solar and storage projects in Riverside County, California, have been placed in service. The projects’ combined capacity of 463 MW solar and 186 MW battery storage will generate enough electricity to power 205,000 homes.

“We are delighted to bring online the Victory Pass and Arica solar and energy storage complex and begin providing cost-competitive clean energy for California homes and businesses with these projects,” said Valerie Wooley, SVP of Origination at Clearway. “This pair of solar and storage projects will enhance the state’s energy grid by providing reliable power when it’s needed most. We are immensely grateful to the eight Victory Pass and Arica customers, whose long-term commitments to procuring clean, reliable energy made this all possible.”

Victory Pass is contracted with Silicon Valley Clean Energy (SVCE) and Central Coast Community Energy (3CE). Arica is contracted with Clean Power Alliance (CPA), Peninsula Clean Energy(PCE), MCE, Southern California Edison (SCE), an affiliate of NRG Energy, Inc., and PepsiCo (NASDAQ: PEP).

Clearway Energy

“Increasing our 24/7 renewable power capabilities is critical to helping our region address a rapidly changing climate,” said Peninsula Clean Energy CEO Shawn Marshall. “This project helps us by producing and storing emission-free solar power that can be used day or night throughout the year.”

Together, Arica and Victory Pass represent a $1 billion investment in Riverside County. In addition, over the life of the projects, Arica and Victory Pass will contribute a combined $25.8 million in taxes that support local schools, hospitals, emergency response and other public services. During construction, the projects created 1,000 union jobs and will support a permanent workforce throughout operations.

These projects add to Clearway’s footprint in Riverside County, where the company now has over 1.2 GW of operating renewable and storage assets across five utility-scale solar projects and four distributed solar installations, in addition to the Arica and Victory Pass solar and storage complex.

News item from Clearway Energy Group 

Source link

Previous Post

UGE to complete seventh community solar project in NYC with Wildflower this summer

Next Post

FAQs About Commercial Solar Power

Next Post
FAQs About Commercial Solar Power

FAQs About Commercial Solar Power

Stay Connected test

  • 23.9k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
New report finds utility rate increase requests and approvals doubled in 2025

New report finds utility rate increase requests and approvals doubled in 2025

28/10/2025
MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

28/10/2025
Advances in semi-transparent solar cell technology drive future energy solutions for buildings

Advances in semi-transparent solar cell technology drive future energy solutions for buildings

28/10/2025
DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

28/10/2025

Recent News

New report finds utility rate increase requests and approvals doubled in 2025

New report finds utility rate increase requests and approvals doubled in 2025

28/10/2025
MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

MXene Additive Boosts Heat Resistance and Efficiency in Perovskite Solar Cells

28/10/2025
Advances in semi-transparent solar cell technology drive future energy solutions for buildings

Advances in semi-transparent solar cell technology drive future energy solutions for buildings

28/10/2025
DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

DGIST research team advances eco-friendly solar cell efficiency using rapid temperature control

28/10/2025
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News