News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

Ann Arbor finishes its largest solar project to date

admin by admin
25/06/2026
in Solar Contractors
0
Ann Arbor finishes its largest solar project to date
0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

Share

A recently built 480-kWAC solar array in southern Ann Arbor, Michigan, is now the city’s largest PV project. This array at Steere Farm Wells is helping power vital water pumping facilities at one of Ann Arbor’s biggest electricity users.

Credit: The City of Ann Arbor

This collaboration resulted from a collaboration between Ann Arbor Water, Information Technology and Office of Sustainability and Innovations (OSI), which led and funded the project in accordance with the city’s A2ZERO carbon neutrality goals.

“There were a lot of moving pieces,” said Simi Barr, OSI senior analyst for municipal operations. “It took collaboration between many city staff and departments, along with external consultants and contractors in order to ensure we designed a system that would serve the intended purpose without jeopardizing the city’s critical water infrastructure.”

This installation is Ann Arbor’s latest in its mission to decarbonize both its own operations and the city at large. In 2025, solar arrays went online at two more city facilities, solar carports were installed at Veterans Memorial Park, an electric pursuit vehicle was added to the Ann Arbor Police department fleet, four all-electric refuse trucks began collection and several other actions were taken to reduce the city’s carbon footprint. More is slated to happen in 2026, including the installation of at least three more solar arrays, including a residential energy storage program led by the city-owned utility Ann Arbor Sustainability Energy Utility.

This work is a part of A2ZERO, the Ann Arbor’s plan for a just and equitable transition to carbon neutrality, community-wide, by 2030.

News item from the City of Ann Arbor

Source link

Previous Post

PowerBank brings online NY community solar project built for Honeywell

Stay Connected test

  • 24k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
Ann Arbor finishes its largest solar project to date

Ann Arbor finishes its largest solar project to date

25/06/2026
PowerBank brings online NY community solar project built for Honeywell

PowerBank brings online NY community solar project built for Honeywell

25/06/2026
Coyote Valley Casino completes 2.23-MW solar carport project

Coyote Valley Casino completes 2.23-MW solar carport project

25/06/2026
94-MW NY solar project to utilize Piled construction quality management platform

94-MW NY solar project to utilize Piled construction quality management platform

25/06/2026

Recent News

Ann Arbor finishes its largest solar project to date

Ann Arbor finishes its largest solar project to date

25/06/2026
PowerBank brings online NY community solar project built for Honeywell

PowerBank brings online NY community solar project built for Honeywell

25/06/2026
Coyote Valley Casino completes 2.23-MW solar carport project

Coyote Valley Casino completes 2.23-MW solar carport project

25/06/2026
94-MW NY solar project to utilize Piled construction quality management platform

94-MW NY solar project to utilize Piled construction quality management platform

25/06/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News