News Solartex
No Result
View All Result
No Result
View All Result
News Solartex
No Result
View All Result
Home Solar Contractors

94-MW NY solar project to utilize Piled construction quality management platform

admin by admin
25/06/2026
in Solar Contractors
0
94-MW NY solar project to utilize Piled construction quality management platform
0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

Share

PileTech, developer of the Piled construction quality management platform, has been selected by Array Foundation Services, a D.A. Collins Company, to provide quality assurance and quality control (QA/QC) technology services for the 94-MW Moraine Solar project in Allegheny County, New York.

Project developer AES awarded Array Foundation Services the foundation installation scope, which includes more than 77,000 pilings. The Piled platform will be deployed across the project to provide real-time field data collection, quality management, engineering review workflows and project reporting throughout foundation construction activities.

The Piled platform

The Moraine Solar project will leverage Piled’s platform to document, track and report installation activities as they occur in the field, providing project stakeholders with immediate visibility into production and quality metrics while creating a comprehensive digital record of foundation installation activities.

Utility-scale solar projects continue to grow in size and complexity, creating an increasing demand for accurate, real-time construction data. Piled was developed specifically to address these challenges by replacing paper-based processes and disconnected reporting systems with a centralized platform designed for renewable energy foundation construction.

“Utility-scale solar projects are generating more field data than ever before, yet many teams still rely on spreadsheets, paper reports, and disconnected systems to manage quality control,” said Ryan Caruso, founder of Piled. “Moraine Solar represents exactly the type of project Piled was built for — delivering real-time visibility across tens of thousands of installations while creating a permanent digital record that owners, EPCs and contractors can trust.”

Piled enables contractors, EPCs, engineers and project owners to capture critical installation data directly from the field, including pile depth, torque values, verticality measurements, installation duration, pass/fail status, engineering reviews and rework documentation. Through real-time dashboards, project mapping and automated reporting, teams gain immediate insight into project performance and quality trends.

The Piled platform will be utilized throughout the Moraine Solar project’s foundation installation activities, helping ensure consistent documentation, streamlined communication between field and engineering teams, and improved transparency across all stakeholders.

News item from PileTech

Source link

Previous Post

What Buyers Need to Know

Next Post

Coyote Valley Casino completes 2.23-MW solar carport project

Next Post
Coyote Valley Casino completes 2.23-MW solar carport project

Coyote Valley Casino completes 2.23-MW solar carport project

Stay Connected test

  • 24k Followers
  • 99 Subscribers
  • Trending
  • Comments
  • Latest
AIKO vs. Trina Solar Panels

AIKO vs. Trina Solar Panels

15/05/2024
Solar Battery Covers | Cover My Inverter

Solar Battery Covers | Cover My Inverter

01/10/2023
ADT Solar to close 22 of 38 branches

ADT Solar to close 22 of 38 branches

02/11/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

29/09/2023
The 5 Best Solar Panels For Your Home or Business

The 5 Best Solar Panels For Your Home or Business

0
The Truth About German Made Solar Panels – Don’t Fall For The Scam!

The Truth About German Made Solar Panels – Don’t Fall For The Scam!

0
Electric Element vs Heat Pump Calculator – MC Electrical

Electric Element vs Heat Pump Calculator – MC Electrical

0
AEE Solar opens new PV equipment distribution center in California

AEE Solar opens new PV equipment distribution center in California

0
PowerBank brings online NY community solar project built for Honeywell

PowerBank brings online NY community solar project built for Honeywell

25/06/2026
Coyote Valley Casino completes 2.23-MW solar carport project

Coyote Valley Casino completes 2.23-MW solar carport project

25/06/2026
94-MW NY solar project to utilize Piled construction quality management platform

94-MW NY solar project to utilize Piled construction quality management platform

25/06/2026
What Buyers Need to Know

What Buyers Need to Know

25/06/2026

Recent News

PowerBank brings online NY community solar project built for Honeywell

PowerBank brings online NY community solar project built for Honeywell

25/06/2026
Coyote Valley Casino completes 2.23-MW solar carport project

Coyote Valley Casino completes 2.23-MW solar carport project

25/06/2026
94-MW NY solar project to utilize Piled construction quality management platform

94-MW NY solar project to utilize Piled construction quality management platform

25/06/2026
What Buyers Need to Know

What Buyers Need to Know

25/06/2026
News Solartex

©2025 Solartex Daily News

Navigate Site

  • Contact Us
  • Home 1
  • Term of Use

Follow Us

No Result
View All Result
  • Contact Us
  • Home 1
  • Term of Use

©2025 Solartex Daily News